英文字典中文字典


英文字典中文字典51ZiDian.com



中文字典辞典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z       







请输入英文单字,中文词皆可:


请选择你想看的字典辞典:
单词字典翻译
82510查看 82510 在百度字典中的解释百度英翻中〔查看〕
82510查看 82510 在Google字典中的解释Google英翻中〔查看〕
82510查看 82510 在Yahoo字典中的解释Yahoo英翻中〔查看〕





安装中文字典英文字典查询工具!


中文字典英文字典工具:
选择颜色:
输入中英文单字

































































英文字典中文字典相关资料:


  • UDCPR-2020 - Maharashtra Industrial Development Corporation
    Biotechnology Unit Park – means a Unit or a Park which is certified as such by the Development Commissioner (Industries) 22 Booster fire pump - means a mechanical electrical device which boosts up the water pressure at the top level of a multi-storied high rise building and which is capable of a pressure of 3 2 kg cm2 at the nearest point
  • DEVELOPMENT CONTROL PROMOTION REGULATION 2034
    Development Control andPromotionRegulation-2034 Development Plan 2034 Municipal Corporation of Greater Mumbai (70) “Grey Water” means waste water from kitchen sink, bathrooms, tubs, showers, wash basins, washing machines, and dish washers excluding the waste water from water closet (W C )
  • Telangana - TGIIC
    TGIIC was established in the year 2014 for identifying and developing potential growth centers in the Telangana fully equipped with developed plots sheds, roads, drainage, water, power and other infrastructural facilities; providing social infrastructure, like housing for workers near industrial zones, co-coordinating with the agencies
  • arltIH lt;OI4, is!~4~~~ - Mumbai
    Whereas,the MunicipalCorporationofGreater Mumbaiis the Planning Authority forjurisdiction of Greater Mumbai (hereinafter referred to as "the said Corporation"las per the provisions ofthe Maharashtra RegionalandTownPlanningAct,1966(hereinafterrefer as "the said act") Thefirst DevelopmentPlan prepared by the said Corporation,was sanctioned in the
  • How to Calculate Development Charges - NoBroker
    In India, development charges are levied by municipal authorities for infrastructure improvements like roads, drainage, water supply, and public amenities How to calculate development charges depends on: Plot Area: Larger areas attract higher charges Type of Property: Residential, commercial, or industrial rates vary
  • Development of Solar Parks and Ultra Mega Solar Power Projects
    The solar parks provide suitable developed land with all clearances, transmission system, water access, road connectivity, communication network, etc The scheme facilitates and speed up installation of grid connected solar power projects for electricity generation on a large scale
  • Uttar Pradesh Shashan - India Code
    Provided that in case any part of land parcel owned by the applicant is earmarked for road, park and open space or green belt in the master plan or zonal development plan, the development fee shall be calculated after deducting the area of such land from the gross area of the scheme subject to the condition that the entire land parcel has to be
  • IDC (Infrastructure Development Charges) in Real estate
    Infrastructure development charges (IDCs) are fees imposed on real estate developers by local authorities to fund the construction or improvement of public facilities like roads and parks They are typically paid as a condition for development approvals or when obtaining building permits
  • Know all about External Development Charges - 99acres. com
    The External Development Charges (EDC) is the amount paid by the developer to the municipal authorities for the maintenance of civic amenities within the project As stipulated in the Real Estate (Regulation and Development) Act (RERA), 2016, EDC caters to the development of roads, water and electricity supply, landscaping, maintenance of drainage and sewage systems, waste management, and any
  • Land Charges in Solar Parks in India - Firstgreen Consulting Pvt Ltd
    Solar parks were designed to reduce the bottlenecks and bring down the cost of large- scale solar development Developers pay for multiple heads of land development charges like land application fees (non-refundable one time), upfront development fee, annual leases of land, annual operation and maintenance charge, stamp duties for registration and service taxes on all component differently in
  • Policy Highlight english
    Other construction - Other construction means construction such as compound wall and gates, security cabins, internal roads, bore well, water tank, internal pipeline network for water and gas, and other related constructions Infrastructure facilities -Infrastructure facilities means such new roads, sewer lines, water drainage,power lines infrastructure, which link the undertaking's premises





中文字典-英文字典  2005-2009